Skip to content
Commercial & Multifamily

Every roof.
Scored. Ranked. Planned.

One engineer-backed operating view of condition, risk, and capital need across the entire portfolio.

Request a Portfolio Condition Report
Most roofing relationships begin with a leak or a bid.
This one begins with a complete condition system.

The operating system.

Occidental RCI methodology.
ASTM D7787-aligned.
01

Scored

Every roof assessed by a HAAG-certified engineer and scored 0–100 on membrane, seams, flashings, drainage, and penetrations.

02

Ranked

Worst first. Weighted by area and consequence. One priority queue across the portfolio.

03

Planned

Three-year capital plan. Dated. Priced. Repair where it holds. Replace where it does not.

The Portfolio Condition Report
Occidental RoofingPortfolio Condition Report
PCR-2026-0112 · WESTGATE PROPERTY PARTNERS · JUL 2026
62
/ 100
Portfolio RCI
FAIR
sq-ft weighted
across 8 roofs
▼ 5 pts vs 2024
Roofs assessed
8
4 systems · 2009–2018
Total area
412,600sf
6 sites · Phoenix metro
FY26 repair scope
$46.7K
6 roofs · keeps 232K sf Good
36-mo capital need
$962K
2 replacements queued
2 roofs need capital action: Chandler South is Critical (22) — replace within 3–6 months · Pinnacle Logistics is Serious (38) — plan replacement 12–18 months.
Good · 232,000 sf
Fair · 71,200
Serious · 88,400
21K
The portfolio, worst first412,600 sf · 6 sites · assessed Jun–Jul 2026
RCIBuildingSystemAreaRULAction · windowCost
22Chandler Tech Park — SouthTPO · 201221,000<1 yrReplace · 3–6 mo$189,000
38Pinnacle Logistics CenterMod-bit · 200988,4001–2 yrPlan replacement · 12–18 mo$773,000
58Chandler Tech Park — NorthTPO · 201228,4004–6 yrRepair scope · 6–12 mo$9,700
61Desert Gateway — Building CTPO · 201442,8006–8 yrRe-weld seams · 90 days$18,400
72Desert Gateway — Building ATPO · 201651,2008–10 yrMinor maintenance · 12 mo$6,200
74Desert Gateway — Building BTPO · 201648,6008–10 yrMinor maintenance · 12 mo$4,800
77Mesa Distribution HubMetal SS · 201196,00012–15 yrRoutine · annual$5,500
81Camelback Corporate PlazaFoam · 201836,20010–12 yrRoutine · annual$2,100
Now — Q4 2026
$235,700
Chandler South replacement + FY26 repair scopes
2027
$773,000
Pinnacle Logistics replacement — bid Q1
2028
$68,000
Recoat + routine programs · portfolio RCI recovers to 74
Scored per Occidental RCI methodology · ASTM D7787-aligned · sq-ft weighted · Sample report; figures illustrative.

This is the operating picture. Everything else executes against it.

Request a Portfolio Condition Report

One system.One queue.One capital plan.

Work is executed against the plan.Not sold against a crisis.

Every scope traces to a line in the report.
Fixed price. Proposal within 48 hours.
01

Replacement

Tear-off and new assembly, specified to the deck, the use, and the code. Phased around tenants and operations.

02

Restoration & coatings

Coating over substrate that still qualifies. Ten to fifteen years added at a fraction of replacement cost.

03

Repair & diagnosis

Infrared and moisture survey before anything is opened. Cause documented in writing.

04

Preventive maintenance

Semi-annual inspection, drains cleared, minor repairs closed. The score updated each visit.

05

Asset management

The report maintained as a standing engagement. Annual re-scoring, re-ranking, and plan revision.

06

Storm & claims

HAAG-certified damage documentation. Adjusters met on the roof. Scope defended line by line.

Request proposal

The right system.Specified honestly.

Engineer-signed specification.
Manufacturer-registered warranty.
SystemSpecified forService life

Single-ply membrane

TPO, EPDM, and PVC over low-slope commercial and multifamily decks. Heat-welded seams, reflective surface, cool-roof compliance.

20–30 yrs

Modified bitumen & built-up

Multi-ply redundancy where a roof takes abuse: equipment decks, foot traffic, and relentless desert UV.

20–25 yrs

Spray polyurethane foam

Seamless, self-flashing, and sloped to drain. The Arizona answer for irregular decks, ponding water, and insulation gain.

25+ yrs

Elastomeric coatings

Silicone and acrylic renewal over a roof that is still structurally sound. Renewable at the end of each cycle without a tear-off.

10–15 yrs

Metal panel & standing seam

Structural and architectural panel engineered for monsoon uplift, with solar and equipment penetrations detailed up front.

40 yrs

Concrete & clay tile

Steep-slope multifamily and campus buildings, where the tile outlives the underlayment beneath it and the reset is what matters.

50 yrs

Service life assumes the assembly is maintained under contract. The engineer’s assessment states which systems your building qualifies for, and which it does not.

Schedule consult

The recordis the system.

Every engagement closes into one permanent file: scope, photographs, inspections, warranty. Usable for insurers, lenders, and auditors. The next assessment is scored against it.

01

Engineer-scoped proposal

Itemized scope and pricing, specified to the deck and the manufacturer. No padding.

02

Daily photo log

Every stage recorded on our operational platform as the work happens.

03

Warranty registration

Manufacturer warranties filed on your behalf and delivered in writing.

04

Closeout binder

The complete record of scope, photos, inspections, and warranty, handed to the owner.

Five controls.

Control 1 of 5

Assessment

A HAAG-certified engineer walks every roof. Membrane, seams, flashings, drainage, penetrations — documented, photographed, and measured.

Selected work.

Top-down drone view of multifamily rooftops mid re-roof
Office and residence campus in the Oro Valley foothills
Garden apartments against the Catalina foothills
Cold-storage facility roof with solar array
Retail plaza roof
Crew applying a roof coating
Midtown multifamily roof
Industrial corridor roofs from the air

Servicelocations.

Specialists and crews dispatched daily across central and southern Arizona. Same operational standard in every market.

Schedule consult
Aerial view of a Tempe multifamily roof with the Phoenix skyline behind
Tile roofs against the Catalina foothills in Tucson
Aerial view of a Nogales cold-storage facility roof with solar
The Phoenix Metro.
Phoenix
Tempe
Mesa
Scottsdale
Chandler
Gilbert
Glendale
Peoria
Surprise
Goodyear
Avondale
Buckeye
Queen Creek
Apache Junction
Paradise Valley
Fountain Hills
Cave Creek
Carefree
Sun City
Litchfield Park
Tolleson
El Mirage
Laveen
Ahwatukee
Anthem
Maricopa
Casa Grande
Florence

Install the operating system on your portfolio.

One scored view. One ranked queue. One capital plan.

Request a Portfolio Condition Report